News Details

Sepang Circuit to be resurfaced

The Sepang International Circuit in Malaysia will close for resurfacing from 15 February to 8 May. The opening 2016 MotoGP test will still take place from February 1-3 as planned. Both Formula 1 and MotoGP races are hosted by the Sepang Circuit and the upgrades are in line with requirements from the FIA and FIM to meet international standards. The entire 5.54km track will be resurfaced plus there will be upgrades done to the drainage system, kerbs and run-off area tarmac. The gravel beds will also be rebuilt at Turns 1 and 15. The last time Sepang was closed for upgrading was in 2007. In a statement, Dato' Razlan Razali, Chief Executive Officer of the Sepang International Circuit...
Full Story »
Share

You May Also Be Interested In...

Guintoli Q&A: Yamaha can fight up front from the start

Former World Superbike champion Sylvain Guintoli says the returning Yamaha...
-8y from Motorsport.com

Petrucci defends allowing Rossi to pass at Valencia

Pramac Ducati rider Danilo Petrucci has defended his actions in the...
-8y from Motorsport.com

Comments

comments powered by Disqus

2015 MGPToday.com
MGPToday.com is not responsible for the news headlines and associated descriptions and images it indexes, the content of externally linked sites or the comments & postings of its users.

This website is unofficial and is not associated in any way with MotoGP.