News Details
Sepang Circuit to be resurfaced
The Sepang International Circuit in Malaysia will close for resurfacing from 15 February to 8 May. The opening 2016 MotoGP test will still take place from February 1-3 as planned. Both Formula 1 and MotoGP races are hosted by the Sepang Circuit and the upgrades are in line with requirements from the FIA and FIM to meet international standards. The entire 5.54km track will be resurfaced plus there will be upgrades done to the drainage system, kerbs and run-off area tarmac. The gravel beds will also be rebuilt at Turns 1 and 15. The last time Sepang was closed for upgrading was in 2007. In a statement, Dato' Razlan Razali, Chief Executive Officer of the Sepang International Circuit...
Full Story »
Full Story »
-10y from SuperSport.com
Comments
You May Also Be Interested In...
Guintoli Q&A: Yamaha can fight up front from the start
Former World Superbike champion Sylvain Guintoli says the returning Yamaha...
-10y from Motorsport.com
Petrucci defends allowing Rossi to pass at Valencia
Pramac Ducati rider Danilo Petrucci has defended his actions in the...
-10y from Motorsport.com
Comments
Hottest News
Honda stuck at "similar potential" to 2025 as...
No description available... Read More »
-17h from Motorsport.com
MotoGP to set minimum salary for riders from 2027
No description available... Read More »
-20h from Motorsport.com
Aprilia’s MotoGP tech secret: a double duct hidden under...
No description available... Read More »
-1d from Motorsport.com













